TransGrid, Pacific Power and Integral Energy - disposal of waste and surplus assets

The ICAC investigated the disposal of specific waste and surplus assets by TransGrid, the NSW public authority responsible for the high-voltage transmission system in NSW; Pacific Power, one of three State owned corporations responsible for electricity generation in NSW and Integral Energy, one of six State owned corporations responsible for the distribution of electricity in NSW.  

In its report on this investigation, made public in June 1998, the ICAC made findings of corrupt conduct against seven persons and stated its opinion that consideration be given to obtaining the advice of the Director of Public Prosecutions with respect to the prosecution of four of these persons for specified offences.

The report also analyses the corruption risks associated with the disposal of assets and details action taken by TransGrid, Pacific Power and Integral Energy to address these risks.

This report is no longer available online. Request the report.